Contract amount: $144,967,306.42
Includes ITS/Tolling components include the design, furnishing, installation and provision of: ITS poles and cabinets, Freeway DMS, Toll Amount DMS (T-DMS) and Lane Status DMS (S-DMS), Microwave Vehicle Detector Sensors (MVDS), CCTV cameras, Ramp Signaling Subsystems, Underground power distribution systems and generator backup systems, and all other related infrastructure.
Client: FDOT District 4
Contract amount: $102,000,000.00
Includes ITS/Tolling components include the design, furnishing, installation and provision of: ITS poles and cabinets, Freeway DMS, T-DMS and S-DMS, MVDS, CCTV cameras, Ramp Signaling Subsystems, Underground power distribution systems and generator backup systems, and all other related infrastructure.
Client: FDOT District 4
Contract amount: $7,982,486.00
Included deployment of ATMS field devices including, CCTV system, ADMS, Arterial Travel Time System (ATTS), MVDS, FOC network along the corridors. Also includes the integration of the ATMS field devices into the Regional Traffic Management Center for District 4, as well as the furnishing, installing, integrating, and testing of the following elements: 22 CCTV, 9 ADMS, 2 MVDS sites, 76 ATTS, the integration of 53 PTMS and a FOC network.
Client: FDOT District 4
Contract amount: $143,000,000.00
Project consisted of Bridges and highways which includes ITS/ tolling components include the design, furnishing, installation and provision of:
ITS poles and cabinets
Toll Amount DMS (T-DMS) and Lane Status DMS (S-DMS)
Microwave Vehicle Detector Sensors (MVDS)
CCTV cameras
Ramp Signaling Subsystems
Underground power distribution systems and generator backup systems
Supporting infrastructure with an underground conduit, pull boxes and splice vaults subsystem
Furnishing, installing and terminating of fiber optic backbone cables and lateral fiber optic cables installed inside the conduits, pull boxes and splice vaults
Furnishing and installing all required Managed Field hardened Ethernet Switches (MFES) and Distribution Switches
Integration of all ITS and tolling components installed in this contract into District Four’s communications network, SunGuide software and District Four’s Express Lanes Toll Pricing Software, testing, and making operational a 100% complete fully functioning ITS/ tolling system to operate as one integrated system with dynamic tolling for the Phase 3B-1 Project.
Achieving Final System Acceptance by FDOT District Four. This includes coordinating the End-to-End testing with FTE as described in FTE’s General Tolling Requirements (GTR).